Setup Menus in Admin Panel

+447946739882, +2348151453146   INFO@CHESSSUBSEAENGINEERING.ORG
     
Sale!

Wellhead & Christmas Tree Components, Installation, Replacement & Maintenance for Operations Engineer and Field Technicians (WCTCIRMOEFT) Level 1 & Level 2

Original price was: $950.00.Current price is: $450.00. exc VAT

Purpose

To develop the highly specialized skills and knowledge required for wellhead & christmas tree components, installation, replacement & maintenance at Level 1 & Level 2.

Wellhead & Christmas Tree Components, Installation, Replacement & Maintenance for Operations Engineer and Field Technicians (WCTCIRMOEFT) Level 1 & Level 2 is designed for Wellhead Engineers, Operations Engineer, Well Engineer, Field Technicians, Field Engineers and Project Engineers.

Training Mode : Online (Only)

Category:

Description

The wellhead and Christmas tree are two critical components of an oil or gas well that are responsible for controlling the flow of fluids from the wellbore to the surface. Proper installation, replacement, and maintenance of these components are crucial for ensuring safe and efficient well operations.

The wellhead is located at the surface of the well and provides a means for casing and tubing to be installed and sealed. It consists of several components, including the casing head, tubing head, and annular preventer. The Christmas tree, on the other hand, is located on top of the wellhead and is responsible for controlling the flow of fluids from the wellbore to the surface. It includes valves, chokes, and gauges.

During the installation of the wellhead and Christmas tree, it is important to ensure that all components are properly aligned and secured. This involves torqueing the bolts to the manufacturer’s specifications and checking for leaks. Once the installation is complete, regular inspections and maintenance should be performed to ensure that the components remain in good working order.

Replacement of wellhead and Christmas tree components may be necessary due to wear and tear, corrosion, or damage. It is important to use the correct replacement components that are designed to meet the specific requirements of the well. When replacing components, it is also important to follow the manufacturer’s guidelines and best practices to ensure that the replacement is done correctly and safely.

Maintenance of the wellhead and Christmas tree components is critical for safe and efficient well operations. Regular inspections should be performed to check for leaks, corrosion, or other signs of damage. Any issues should be addressed promptly to prevent them from becoming more serious and potentially causing a safety hazard. In addition, regular maintenance activities such as lubrication, cleaning, and pressure testing can help to extend the lifespan of the components and ensure reliable performance.

WCTCIRMOEFT Level 1 & Level 2 covers Introduction to Oil and Gas Wells, Component Requirements Applicable to All Wellheads, Basic Components of a Wellhead, Advanced Wellhead Techniques, Sweet Flowing Wells, Critical Sour, Sour and Corrosive Wells, Artificial Lift Wells, Other Well Types, Offshore Wellheads, Wellhead Installation Procedures, Wellhead Replacement & Maintenance Procedures and more

WCTCIRMOEFT Level 1 & Level 2 is designed to provide detailed knowledge of Wellhead & Christmas Tree Components, Installation, Replacement & Maintenance for Operations Engineer and Field Technicians and will assist those who are switching, off job for awhile or enhancing there career in Wellhead & Christmas Tree Components, Installation, Replacement & Maintenance operations.

Course Outlines

Background on Oil and Gas Wells.
Component Requirements Applicable to All Wellheads.
Basic Components of a Wellhead.
Advanced Wellhead Techniques

Sweet Flowing Wells.
Critical Sour, Sour and Corrosive Wells.
Artificial Lift Wells.
Other Well Types

Mudline Suspension
Subsea Wellhead

Leveling & Cold Cutting
Welding
Weld Test
Casing Running and Hanger Set
N/U and Test BOP

Wellhead Removal Procedures
13 3/8” Preparation for Repair
Dressing 13 3/8” for Welding
J nipple and Wellhead Installation
Setting Casing Bowl
Rough Cut Casing
Emergency Slip Installation
Dressing Casing Stub
Casing Stub Final Dress and Measurements
Pack Off Installation

Assessment

Participant underpinning knowledge of wellhead & christmas tree components, installation, replacement & maintenance will be accessed with short answer multiple choice questionnaire at the conclusion of the course.

Outcome

Participants will gain an in debt understanding of wellhead & christmas tree components, installation, replacement & maintenance. They will also be able to function with minimum supervision as Wellhead Engineers, Operations Engineer, Well Engineer, Field Technician or Engineer for IOCs, drilling contractor or drilling procurement vendors.

Professional Certificate

Issued directly by Chess Subsea Engineering Europe.

How to Register

Click here to download registration booklet on msword and email completed booklet to info@chesssubseaengineering.org directly.

© 2023. All Rights Reserved.
X