Description
The installation of offshore pipelines can be a complex process that requires careful planning and analysis to ensure the pipeline is installed safely and efficiently. Orcaflex can be used to model the installation process and simulate the installation environment, including the effects of waves, currents, and vessel motions. This allows engineers to evaluate the feasibility of different installation scenarios and optimize the installation procedure.
OPIDLRASPIE Level 4 covers dynamic analysis of Pipeline S Lay Installation Simulation via Articulated Stinger with ORCAFLEX for Simple & Explicit method and closed out with Pipeline Davit Lift Simulation.
Course Outline
Introduction to Subsea Pipeline Installation
Subsea Pipeline Laying Techniques
Subsea Pipelay Vessels
OrcaFLEX for Pipe Lay Analysis
Workshop 1 Introduction : 10 inch Production Pipeline S Lay Installation Simulation via Articulated Stinger Simple Method
Workshop 2 Introduction : 10 inch Production Pipeline S Lay Installation Simulation via Articulated Stinger Explicit Method
Workshop 3 Introduction : Pipe Davit Lift
Introduction to Lay On Tower Simulation with ORCAFLEX
Building the Model & Setting General Data
Building the Model & Setting Vessel Data
Building the Model & Setting Line Data
Building the Model & Setting SHEAR 7 Data
Building the Model & Setting VIVA Data
Building the Model & Setting All Object Data
Result Analysis of Lay On Tower Simulations
Introduction to Lay On Tower Simulation with ORCAFLEX
Building the Model & Setting General Data
Building the Model & Setting Vessel Data
Building the Model & Setting Line Data
Building the Model & Setting SHEAR 7 Data
Building the Model & Setting VIVA Data
Building the Model & Setting All Object Data
Result Analysis of Pipe lay via Explicit Simulations
Building the Model & Setting Shared Data
Building the Model & Setting Work Boat
Building the Model & Setting Pipeline
Building the Model & Setting Lifting Winches
Building the Model & Setting Stern, Post and Bow Post
Outcome
Participants will gain an in debt understanding of Offshore Pipeline Installation & Davit Lift Recovery Analysis with Orcaflex for Subsea Pipeline Installation Engineers at Level 4.
They will also be able to function with minimum supervision as a Subsea Installation Engineer for IOCs, subsea SURF installation engineer, subsea pipeline company contractor, vendor or installation company.
Certificate of Completion
At the end of the course certificate of Completion Based on Scottish NVQ standard Level 4 & 5 shall be issued directly from Chess Subsea Engineering Europe.
How to Register
Click here to download registeration booklet on msword and email completed booklet to info@chesssubseaengineering.org directly.