-
Kelvin changed their profile picture 4 years, 8 months ago
-
Kelvin replied to the topic Deepwaters Subsea Field Architecture & Development in the forum Subsea Engineering Beginners Master Class (SEBMC) Level 1 & Level 2 4 years, 8 months ago
***FIELD ARCHITECTURE: WELL TESTING***
For satellite wells with individual flowlines tied back to the production platform, it is often simply a matter of connecting the well flowlines to the well test manifold. A well test heater may be needed ahead of the separator that otherwise might not be necessary in the case of dry tree production.
-
Kelvin replied to the topic Deepwaters Subsea Field Architecture & Development in the forum Subsea Engineering Beginners Master Class (SEBMC) Level 1 & Level 2 4 years, 9 months ago
***FIELD ARCHITECTURE: INTRAFIELD FLOWLINES: MAJOR FLOWLINE ROUTING CONSIDERATIONS : DIFFERENCE IN PIGGING REQUIREMENTS***
The platform might be best located nearer the wells requiring frequent pigging versus those that do not.
-
Kelvin replied to the topic Deepwaters Subsea Field Architecture & Development in the forum Subsea Engineering Beginners Master Class (SEBMC) Level 1 & Level 2 4 years, 9 months ago
***FIELD ARCHITECTURE: INTRAFIELD FLOWLINES: MAJOR FLOWLINE ROUTING CONSIDERATIONS : DIFFERENCE IN RESERVOIR & WELL PERFORMANCE***
Some wells are capable of flowing greater distances than others due to their higher pressure or lower pressure drop (such as a high gas-oil ratio well versus a low gas-oil ratio well). This might affect where the…[Read more]
-
Kelvin replied to the topic CADDAS 006 in the forum CADDAS Programme Nigeria Online Forum 4 years, 10 months ago
Engineering of SURF – Functional Requirements
API Specification 17J formally specification for Unbounded Flexible Pipe is now adopted as ISO-13628-2
- Load More